EES software required, Thermodynamic

Mechanical Engineering Thermodynamics

A steam power cycle is operating with one open feedwater heater. Steam enters the high pressure turbine at 1600 psia, 1100°F. The steam expands through the high pressure turbine to 100 psia where some of the steam is extracted and diverted to an open feedwater heater. The remaining steam expands through the low pressure turbine to the condenser pressure of 1 psia. Saturated liquid exits the feedwater heater and the condenser. The isentropic efficiency of the both turbines is 85% and the isentropic efficiency of the pumps is 90%. The net power output of the cycle is 220 MW.

1. Build a complete property table showing the pressure, temperature, enthalpy, entropy, quality, and mass flow fraction for each state.

2. Once the table is complete, determine the following parameters,

a) The mass flow rate of the steam in the cycle (lbm/hr)

b) The boiler specific heat transfer (Btu/lbm of steam entering the high pressure turbine)

c) The thermal efficiency of the cycle

d) The heat rate of the cycle

3. Compare the values calculated for this regeneration model with those found for the simple Rankine cycle in HW #23 and the Reheat cycle in HW #24.

4. Conduct a sensitivity study on the open feedwater heater pressure. Explore pressures between 50 psia and 500 psia. Comment on the trends you observe in thermal efficiency, boiler specific heat transfer, and required mass flow rate.

Processamento de dados

ID do Projeto: #10136213

Sobre o projeto

3 propostas Projeto remoto Ativo em há 7 anos

3 freelancers estão ofertando em média $47 nesse trabalho

bemarriott

So when is this homework assignment due? lol. I can do this for you. It would be a good brush up for me. And I need to get some reviews under my belt on here. Anyway, let me know if you want me to do it for you.

$45 USD in 2 dias
(0 Comentários)
0.0
pmdeshpande4

Dear Sir, Firstly thank you very much for enlisting the inquiry. My Introduction: Professional chemical engineer with 4+ year experience in power sector. I am closely connected with following activities in my job pr Mais

$45 USD in 2 dias